New outlet pipes into Öresund
In connection with the development and reconstruction of the Sjölunda wastewater treatment plant, we will construct two new outlet pipes in the Öresund.
Scope
Quantity: 2 pipes
Length: 4 000 m
Internal diameter: 1,8 m
The new outlet pipes will be laid on the seabed from the shoreline at the new outflow pumping station and approximately four kilometres out into the Öresund. For the first two kilometres out to sea, the outlet pipes are planned to be laid in a dredged channel owing to hydraulic requirements and water depth. For the last two kilometres, the outlet pipes will be laid on the seabed and are planned to be secured with steel piles.
The construction of the new outlet pipes will also include work on emergency sewers and erosion protection.
What is happening right now
- Market analysis is progress
- System document to be finalised, including studies